Gray day but still 44.2°f.
We're down to installing 1 more 12' register and plumbing 2 from the crawl space side & then ''we be ready for a test n' tune''. Do a leak down test & make sure she's buildin' even heat in the tubes.
Then I plan to build a chase for the water pipes & insulate the rest of the floor so we'll get a little radiant heat from the "to & from" pipes. I did that for the master bath a few years ago, & it sure is nice having a toasty floor. Foyer, tile floor, has always been cold. This ought to fix that.
Update:
Picked up 3/4" CDX and 3/4" foil insulation from Menards after church, to build the chases. Got to get it all done now. Once I close the trap door on the crawl space, the chances of me going back down there at some later date to finish it up are slim.
Had a meeting after church to see what needs to be done on the Christmas stage. I better get the heat done so I can concentrate on the stage. Lots o' stuff to do. I've been drawing the 4'x8' store front panels with a magic marker on the CNC. I've been keeping up with the painters so far. They only have about 15 painted (I've got 30 drawn) but, there's 70 total to do. Times a wastin'. First performance is 19 days away
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.