Thanks Jack. I be a tired pup tonight. I have it all tiled but for 2 sheets of mosaic tile and the trim around the door. Might do that tomorrow afternoon, just to get the tiling done. I was short a couple sheets of mosaic tile, so I thought I'd just have them ship it rather than drive the 1.2 hours each way to pick them up. Nope, they wouldn't ship them
so I ran up there this afternoon and got em.
. I have most of the gout done. Then caulk all the corners and touch up a little paint and it'll be time to start on the vanity and storage closet. I cheated and bought the doors I never got around to making. I plan to refinish everything and I have new hardware to install to give it a little different look. I took the old spindle and rail moulding off around the top. so we can install something a little less dated. Getting a little closer, slowly but closer to the end.
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.