Here you go Jack. I've been pre-occupied lately. There're inching closer everyday but cold weather has slowed them down a little. They striped the lanes a few days ago, so I guess that means the last layer of asphalt will go down next Spring when the temps come back up.
Broadway 12 20 19 1.jpg (240.89KiB)Viewed 2044 times
Broadway 12 20 19 2.jpg (195.83KiB)Viewed 2044 times
Broadway 12 20 19 3.jpg (202.82KiB)Viewed 2044 times
Broadway 12 20 19 4.jpg (179.5KiB)Viewed 2044 times
Broadway 12 20 19 5.jpg (211.23KiB)Viewed 2044 times
Last edited by pro70z28 on Fri Dec 20, 2019 3:40 pm, edited 4 times in total.
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.
few from today. They have most of the sidewalk done on the west side, but a lot of sidewalk left on the east side. The street light crew is still burying cable and pouring footings for the east side, kind of holding up the process a bit.
Broadway 12 20 19 6.jpg (171.58KiB)Viewed 2044 times
Broadway 12 20 19 7.jpg (157.16KiB)Viewed 2044 times
Broadway 12 20 19 8.jpg (266.22KiB)Viewed 2044 times
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.
Howdy, Gary and all. I did my last day at work before the holiday today. Emily arrives Sunday night for a week. I hope everyone has a great Christmas. bp