Postby pro70z28 » Fri Feb 15, 2008 10:22 pm
I got the driver's side door aligned, Quarter panel & door latch brackets welded in. Got the door all cut & filed for the bear claw latch. Install the latch tomorrow and then it's on to the firewall.
I have to refab the dash bar that had to be removed to get the intercooler to fit under the dash. Then fabricate the intercooler brackets. Problee' do the brakes & steering column at the same time. Then rebuild the firewall to fit around all this stuff.

Last edited by
pro70z28 on Sat Feb 16, 2008 8:15 am, edited 2 times in total.
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.